70 58 40 04 10 Perform quality control of design during a run
Last modified by Susheela Pfeil on 2021/11/25 11:08
Contents
Perform quality control of design during a run (70 58 40 04 10)
ESCO description
Title | Perform quality control of design during a run |
Description: | Control and ensure the quality of design results during a run. |
Scope note: | n.a. |
Concept URI: | http://data.europa.eu/esco/skill/3a1c546d-914a-46e4-a7c1-47d43646fedd |
ESCO version: | 1.08 |
In other languages
Deutsch: | Qualitätskontrolle von Konstruktionen während eines Durchlaufs durchführen (Kontrolle und Sicherstellung der Qualität der Konstruktionsergebnisse während eines Durchlaufs.) |
Nederlands: | kwaliteitscontrole van een ontwerp uitvoeren tijdens een proefrun (Controleren en waarborgen van de kwaliteit van de resultaten van het ontwerp tijdens een testrun.) |
Italiano: | controllare la qualità di un progetto con una prova (Controllare e garantire la qualità dei risultati del progetto durante una prova.) |
Development notes
Status: In progress / second read / finalised (date)
(The notes below will be removed at the end of the project)
Sectoral layer
The english term "run-through" = rehearsal situation is meant here.
Structure
Field and subfield: | 70 58 |
Place in the process: | 40 |
Level: | 04 |
Unique identifier: | 10 |
Sectoral detail
Skills
- Check if the quality of the design concept is maintained
- Evaluate with the operators and production staff
- Propose alternatives or ameliorations
- Communicate with appropriate departments on maintenance needs
Knowledge
- The design concept
- Techniques and various technical solutions
Autonomy / attitude
- Patience
- Respect for the team
Assessment
Self assessment
- I don't know how to control and ensure the quality of design results during a run.
- I am uncertain how to control and ensure the quality of design results during a run.
- I know how to control and ensure the quality of design results during a run.
- I am more than able to control and ensure the quality of design results during a run.
Mentor assessment
- ... doesn't know how to control and ensure the quality of design results during a run.
- ... is uncertain how to control and ensure the quality of design results during a run.
- ... knows how to control and ensure the quality of design results during a run.
- ... is more than able to control and ensure the quality of design results during a run.
Acceptable assessment methods
Training
Experience on site is the key to understanding the processes and skills.
References
- TTT/LPT - 30 10 40 01 Quality control of design results during a run