70 56 10 05 30 Budget set costs
Zuletzt geändert von Randell Greenlee am 2022/02/16 06:55
Contents
Budget set costs (70 56 10 05 30)
ESCO description
Title | Budget set costs |
Description: | Prepare set production budgets. |
Scope note: | N/A |
Concept URI: | http://data.europa.eu/esco/skill/1972c7f5-b157-42ad-bd7e-0e05cdfd5327 |
ESCO version: | 1.08 |
In other languages
Deutsch: | Budget für die Herstellung von Kulissen planen (Festgelegte Produktionsbudgets vorbereiten.) |
Nederlands: | decorkosten begroten (De decorproductie begroten.) |
Italiano: | definire il bilancio dei costi per il set (Preparare bilanci di produzione per il set.) |
Development notes
Status: final read / finalised (date)
(The notes below will be removed at the end of the project)
Sectoral layer
Scope note
This refers to smaller productions where the planning has been done and cost estimates are directly related to the materials and working time. in this competence “costs” also refer to costs for lighting and sound equipment and personnel.
Structure
Field and subfield: | 70 56 |
Place in the process: | 10 |
Level: | 05 |
Unique identifier: | 30 |
Sectoral detail
Skills
- Gather accurate and detailed information about expenditure headings
- Identify the costs required for resources
- Identify the available budget
- Budget for contingencies
- Allocate costs to expenditure headings
- Discuss budget with responsible people
- Confirm budget with responsible people
Knowledge
- Methods for budgeting
- Sorts of expenditure headings and budget levels
- Organisations financial systems and procedures
- Reporting and documenting methods
Autonomy / attitude
Being realistic
Awareness of cost effectiveness
Sense of methodology
Assessment
Self assessment
- I don't know how to prepare set production budgets.
- I am uncertain how to prepare set production budgets.
- I know how to prepare set production budgets.
- I am more than able to prepare set production budgets.
Mentor assessment
- ... doesn't know how to prepare set production budgets.
- ... is uncertain how to prepare set production budgets.
- ... knows how to prepare set production budgets.
- ... is more than able to prepare set production budgets.
Acceptable assessment methods
Training
Working with training budgets (Post Box Exercises) in different situations and venues.
References
- Germany: Fachkraft für Veranstaltungstechnik – Event Technology Specialist - Learning Area A: Skills, Knowledge and Competences – (Item 4.1d) Assess event-related concepts, especially from a legal, organizational, economic and design perspective, Assess submitted concepts, Estimate organizational time and effort, Consider economic feasibility – BiBB Bundesinstitut für Berufsbildung, AUSBILDUNG GESTALTEN - Fachkraft für Veranstaltungstechnik, Bonn 2017, ISBN: 978-3-7639-5873-3 (Print), ISBN: 978-3-96208-021-1 (PDF)
- Germany: Fachkraft für Veranstaltungstechnik – Event Technology Specialist - Learning Area A: Skills, Knowledge and Competences – (Item 7.1d) Determine costs according to operational guidelines, taking time, material and financial expenses into account, Estimate the project costs according to calculation schemes, Determine total costs for personnel and material, Determine costs for external personnel and external material
– BiBB Bundesinstitut für Berufsbildung, AUSBILDUNG GESTALTEN - Fachkraft für Veranstaltungstechnik, Bonn 2017, ISBN: 978-3-7639-5873-3 (Print), ISBN: 978-3-96208-021-1 (PDF) Netherlands: Qualification File Stage and Event Technology, crebonumber 79040, learning area P3-K1: Voert de preproductie uit. Sectorchambre ICT and Creative Industry, version 2022 (to be released August 2022), Zoetermeer 2021.