70 55 00 04 10 Write risk assessment on performing arts production
Version 5.1 by Randell Greenlee on 2021/10/06 15:26
Contents
Title (70 55 00 04 10) Write risk assessment on performing arts production
ESCO description
Title | Write risk assessment on performing arts production |
Description: | Assess risks, propose improvements and describe measures to be taken on a production level in performing arts. |
Scope note: | n.a. |
Concept URI: | http://data.europa.eu/esco/skill/271a36a0-bc7a-43a9-ad29-0a3f3cac4e57 |
ESCO version: | 1.08 |
In other languages
Deutsch: | Risikoanalysen zu Produktionen der darstellenden Kunst verfassen (Bewertung der Risiken, Unterbreitung von Verbesserungsvorschlägen und Beschreibung der Maßnahmen, die auf der Ebene der Produktion in den darstellenden Künsten getroffen werden sollen.) |
Nederlands: | risicoanalyses voor podiumproducties opstellen (Risico's beoordelen, verbeteringen voorstellen en maatregelen beschrijven op productieniveau in podiumkunsten.) |
Italiano: | scrivere la valutazione dei rischi relativi alla produzione di uno spettacolo (Valutare i rischi, proporre miglioramenti e descrivere le misure da adottare a livello di produzione nelle arti dello spettacolo.) |
Development notes
Status: In progress / second read / finalised (date)
(The notes below will be removed at the end of the project)
Sectoral layer
Does not include risk assessment as understood as part of the competences required in the EQF Level 6.
See: http://data.europa.eu/esco/skill/594bd121-9614-4e87-9ecf-6ccb95507efe
However, contribution in the process is accepted.
Structure
Field and subfield: | 70 55 |
Place in the process: | 00 |
Level: | 04 |
Unique identifier: | 10 |
Sectoral detail
Skills
...
Knowledge
...
Autonomy / attitude
...
Assessment
Self assessment
- I don't know how to assess risks, propose improvements and describe measures to be taken on a production level in performing arts.
- I am uncertain how to assess risks, propose improvements and describe measures to be taken on a production level in performing arts.
- I know how to assess risks, propose improvements and describe measures to be taken on a production level in performing arts.
- I am more than able to assess risks, propose improvements and describe measures to be taken on a production level in performing arts.
Mentor assessment
- ... doesn't know how to assess risks, propose improvements and describe measures to be taken on a production level in performing arts.
- ... is uncertain how to assess risks, propose improvements and describe measures to be taken on a production level in performing arts.
- ... knows how to assess risks, propose improvements and describe measures to be taken on a production level in performing arts.
- ... is more than able to assess risks, propose improvements and describe measures to be taken on a production level in performing arts.
Acceptable assessment methods
[remove methods not used]
- Observation in simulated environment
- Observation on site
- Role play
- Post Box Exercise
- Structured portfolio
- Criterion based interview
- Oral examination
- Written test multiple choice
- Written test open answers
Training
[put tips, good practices, requirments, ... for training this competence here]
References
- [put references to other competence systems here]