From version < 1.4 >
edited by Randell Greenlee
on 2022/01/05 15:19
To version < 1.2 >
edited by Susheela Pfeil
on 2021/11/12 10:04
< >
Change comment: Update document after refactoring.

Summary

Details

Page properties
Author
... ... @@ -1,1 +1,1 @@
1 -XWiki.RandellGreenlee
1 +XWiki.SusheelaPfeil
Content
... ... @@ -40,17 +40,10 @@
40 40  
41 41  == [[Sectoral layer>>doc:01 Sectoral Layer.Sectoral Layer Glossary.Sectoral layer.WebHome]] ==
42 42  
43 -==== Scope Note: ====
44 -
45 45  (% class="wikigeneratedid" %)
46 46  (((
47 -In some Member States, occupational health and safety regulations apply. These dictate special competences and relate to local regulations and standards.
45 +(The sector layer contains the refined definition of the ESCO competences in sector specific wording)
48 48  
49 -The load systems described here are //statically determinate systems//.
50 -
51 -Excludes the building, using and hanging of the suspension constructions
52 -The competence is limited to the physical placement of the equipment, not the electrical connections (which are dealt with in mobile electricity competence)
53 -
54 54  === [[Structure>>doc:01 Sectoral Layer.Sectoral Layer Glossary.Structure.WebHome]] ===
55 55  
56 56  (% style="width:618.25px" %)
... ... @@ -68,16 +68,9 @@
68 68  
69 69  ==== [[Skills>>doc:01 Sectoral Layer.Sectoral Layer Glossary.Skills.WebHome]] ====
70 70  
71 -(((
72 -* inspect the technical performance equipment visually for damage, wear and tear
73 -* transport, place, move, stack and transport technical performance equipment and materials according to the needs during the fit up
74 -* mount and rig technical performance equipment according to instructions and/or plans
75 -* check that technical performance equipment and objects can move freely during different operations when needed
76 -* immobilize technical performance equipment once in place
77 -* secure technical performance equipment and accessories
78 -* check that all technical performance equipment are secured according to safety procedures
79 -* take action if something goes wrong
80 -* report if something is not performed according to the agreed procedures.
64 +* (((
65 +(% class="wikigeneratedid" id="H..." %)
66 +...
81 81  )))
82 82  
83 83  ==== [[Knowledge>>doc:01 Sectoral Layer.Sectoral Layer Glossary.Knowledge.WebHome]] ====